Suter Creek Restoration

Project Owner: Suter Creek Restoration Project Type: Bid, Design-Build, provided quote and owner liked the bridge over a culvert Precaster: Pacific Bridge & Construction, Inc. Installation: Pacific Bridge & Construction, Inc. Project Timeframe: Three Weeks Project Description: Replace an aging double culvert with a modular precast concrete bridge. Project Features: Bridge is 27’ long

Pleasant View

Project Owner: Pleasant View Cemetery Project Type: Bid, Design-Build, provided quote and owner liked the bridge over a culvert Precaster: Pacific Bridge & Construction, Inc. Installation: Pacific Bridge & Construction, Inc. Project Timeframe: Five Days Project Description: Replace a 60” culvert with a modular precast concrete bridge. Project Features: Bridge is 25’ long by 15’ […]

Delph Creek

Project Owner: Clackamas County Contract type: Design, Bid, Build Project Description: Remove and replace two 54” diameter culverts with a precast, modular bridge. Project Features: Bridge is 38’ long with a 33’ clear span and 25’ width. Special Features: Wing walls were designed and built with varying lengths and features. Three wing walls were built […]

Kleinsmith Bridge

Project Owner: Clackamas County Contract type: Design, Build Project Timeframe: Three Weeks Special Features: Abutment system was built using a “stair-stepped” spread footing design to reduce product and save excavation cost while still maintaining the required scour depth. Wing walls were placed at various angles allowing them to follow the natural curvature of the road. […]

McKay

Project Owner: Crook County Contract type: Emergency Project Description: Replaced a washed out culvert with a modular, low-profile concrete bridge system. Project Features: Bridge is 21’ long with a 16’ clear span and 40’ width. Special Features: Our product was chosen for it’s low pro¬file design and the (ABC) Accelerated Bridge Construction technology. There were […]